Recent Projects

Pharmaceutical Process Equipment and Production Lines

The complete design, supply and manufacture of the control panels and on-site electrical installation together with the full PLC / SCADA programming, testing and commissioning for nine production lines.

Contract period : August 1999 - July 2001Total contract value : £1.6m

Petrochemical Installations

The complete design, supply and on site electrical installation together with the full testing and commissioning for two new fuel oil storage tanks, including Import / Export Pumping system and tank level control system.

Contract period : July 2001 - January 2002Total contract value : £0.6m

Various Sewage Treatment Works and Water Treatment Works

Complete electrical installation associated with the Mains Distribution, Power, Lighting, SCADA system and ICA system.

Contract period : 1990 - Present dayTotal contract value : £3.0m

350 Automatic capping, tipping and bottle sorting machines

Full design and manufacture of the PLC control panels including the software programming and the on-site machine wiring at premises throughout the UK and Europe

Contract period : September 1992 - Present dayTotal contract value : £1.2m

30 Automatic Welding Machines for the Automotive Industry

Full design and manufacture of PLC Machine Control Panels and the on-site machine wiring and testing.

Contract period : 1992 - Present dayTotal contract value : £0.33m

Production line and Gassing room control panels

Full design, supply, manufacture and commisssioning of 4 Production Line Panels for aerosol filling system and 2 Gassing House fully automatic monitoring control panels and all on-site wiring. Location : France

Contract period : August 1995 - September 1995Total contract value : £0.08m

Special Hospital Nurse Call/Radio Decentralisation Project

Supply, installation, wiring and commissioning of a completely new Patient Call System and Radio System for 140 Patient Rooms. The Patient Call System was PLC based with all local indication / re-set devices and Central Nurse Station indication

Contract period : July 1995 - November 1995Total contract value : £0.19m

High Temperature Furnace Pollution Control System

Full design, manufacture and on-site electrical installation of the PLC / Mimic Control panel.

Contract period : January 2000 - October 2000Total contract value : £0.16m

Offices

Complete electrical services including the design, supply, installation and commissioning of the lighting, clean and dirty power, emergency lighting, data system and voice communication system

Contract period : July 2001 - December 2001Total contract value : £0.15m

Classroom Block

Full design, supply, installation and commissioning of general lighting, emergency lighting, general power, data and voice installation and fire alarm system

Contract period : December 1996 - April 1997Total contract value : £0.07m

Sports Center and Club House

Full design, supply and installation of specialist lighting, general lighting, emergency lighting, general power, electrical services associated with heating and ventilation, and fire alarm system

Contract period : January 2001 - July 2001Total contract value : £0.17m

Reservoir and Pumping Station

Complete lighting, power, low voltage and emergency lighting system

Contract period : November 1992 - April 1993Total contract value : £0.07m