Pharmaceutical Process Equipment and Production Lines |
| The complete design, supply and manufacture of the control panels and on-site electrical installation together with the full PLC / SCADA programming, testing and commissioning for nine production lines. |
| Contract period : August 1999 - July 2001 | Total contract value : £1.6m |
|
 |
Petrochemical Installations |
| The complete design, supply and on site electrical installation together with the full testing and commissioning for two new fuel oil storage tanks, including Import / Export Pumping system and tank level control system. |
| Contract period : July 2001 - January 2002 | Total contract value : £0.6m |
|
 |
Various Sewage Treatment Works and Water Treatment Works |
| Complete electrical installation associated with the Mains Distribution, Power, Lighting, SCADA system and ICA system. |
| Contract period : 1990 - Present day | Total contract value : £3.0m |
|
 |
350 Automatic capping, tipping and bottle sorting machines |
| Full design and manufacture of the PLC control panels including the software programming and the on-site machine wiring at premises throughout the UK and Europe |
| Contract period : September 1992 - Present day | Total contract value : £1.2m |
|
 |
30 Automatic Welding Machines for the Automotive Industry |
| Full design and manufacture of PLC Machine Control Panels and the on-site machine wiring and testing. |
| Contract period : 1992 - Present day | Total contract value : £0.33m |
|
 |
Production line and Gassing room control panels |
| Full design, supply, manufacture and commisssioning of 4 Production Line Panels for aerosol filling system and 2 Gassing House fully automatic monitoring control panels and all on-site wiring. Location : France |
| Contract period : August 1995 - September 1995 | Total contract value : £0.08m |
|
 |
Special Hospital Nurse Call/Radio Decentralisation Project |
| Supply, installation, wiring and commissioning of a completely new Patient Call System and Radio System for 140 Patient Rooms. The Patient Call System was PLC based with all local indication / re-set devices and Central Nurse Station indication |
| Contract period : July 1995 - November 1995 | Total contract value : £0.19m |
|
 |
High Temperature Furnace Pollution Control System |
| Full design, manufacture and on-site electrical installation of the PLC / Mimic Control panel. |
| Contract period : January 2000 - October 2000 | Total contract value : £0.16m |
|
 |
Offices |
| Complete electrical services including the design, supply, installation and commissioning of the lighting, clean and dirty power, emergency lighting, data system and voice communication system |
| Contract period : July 2001 - December 2001 | Total contract value : £0.15m |
|
 |
Classroom Block |
| Full design, supply, installation and commissioning of general lighting, emergency lighting, general power, data and voice installation and fire alarm system |
| Contract period : December 1996 - April 1997 | Total contract value : £0.07m |
|
 |
Sports Center and Club House |
| Full design, supply and installation of specialist lighting, general lighting, emergency lighting, general power, electrical services associated with heating and ventilation, and fire alarm system |
| Contract period : January 2001 - July 2001 | Total contract value : £0.17m |
|
 |
Reservoir and Pumping Station |
| Complete lighting, power, low voltage and emergency lighting system |
| Contract period : November 1992 - April 1993 | Total contract value : £0.07m |
|